F'HOUSE
Rain Creek Farm
David completed the above floor plumbing that stubs out a
foot beneath the floor. The original sink was cold water only. Although the
pipes are all new, both the cold water and waste pipes are in the same position
as the originals. David planned on having water running by Friday night. But
after pushing through the last ten feet on his back he got himself wedged under
a house beam twenty-three feet from the crawlspace access and ten feet short of
the connections. The next (last) beam looked even lower, so a trench will need
to be dug under the last two beams or another plan made Saturday.
(09.24.04)