Previous Page
Index
Search
Next Page
Painting the Scheel House - August 10,
2002 |
Click on Image to Enlarge
|
Fayetteville
First thing this morning (after the post office) we went to Fayetteville Propane
and ordered a fancy new heating stove. This one is dark green, ours will
be the exact same style, but in flat black cast iron. Despite its
old-fashion appearance, it is a completely automatic heating system with a wall
thermostat just like any other whole-house heater. The output is enough
for our entire house. (08.10.02) |
Click on Image to Enlarge
|
Scheel House
After a quick trip to Ellinger for a Hruska kolache and a visit to Koehl's for
garage paint and a fence post, David returned home to tear down and rebuild our
airless paint sprayer (after five years of storage the valves needed a little
attention). Here he is preparing to paint the exterior of the Scheel
House. (08.10.02) |
Click on Image to Enlarge
|
Scheel House
At 11:43am David started spraying five gallons of house paint on the Scheel
House. (08.10.02) |
Click on Image to Enlarge
|
Scheel House
Twenty minutes later you could start to get an idea what it was going to look
like. (08.10.02) |
Click on Image to Enlarge
|
Scheel House
Linda tries her hand at spray painting. (08.10.02) |
Click on Image to Enlarge
|
Scheel House
The left side (side porch) and the back that your can't see, already have vinyl
siding. The paint is a temporary measure to keep the Scheel House from
deteriorating and to make it look better while it waits for us to finish the
Jurecka Farmhouse. (08.10.02) |
Click on Image to Enlarge
|
Scheel House
David can tell you that its really hot on that metal roof today. It was
90F from 10am to 5pm. (08.10.02) |
Click on Image to Enlarge
|
Scheel House
Big difference with the porch painted. All the sudden you can see the
doors and windows. Two of the three sheets of metal skirt are attached,
the third (at the far end) has not been attached yet. (08.10.02) |
Click on Image to Enlarge
|
Scheel House
Here's how far five-gallons and two hours got us today. Almost everything
got painted. We will need to apply a second coat sometime in the near
future. (08.10.02) |
Click on Image to Enlarge
|
Scheel House
After lunch David attached the third sheet of skirting and painted all three
barn red. (08.10.02) |
Click on Image to Enlarge
|
Scheel House
Linda relaxes and takes a look at the work done on the Scheel House.
Behind Linda and the farm truck is the garage shed. That green building
will be painted white to match the farmhouse. (08.10.02) |
Previous Page
Index
Search
Next Page
|
November 02, 2006
|