Rain Creek Farm -
Progress Updates
|
|
October 14, 2001 
|
|

Click on Image to Enlarge
|
A temporary water line is run from the pump house to the farmhouse. By the
end of the day all of the bathroom cold water plumbing was fully
functional. Non-compatible pipes kept the water heater from being
connected today. (10.14.01) |
|

Click on Image to Enlarge
|
The family room is emptied out in preparation for floor paint and
furniture. This view is towards the back patio. (10.14.01) |
|

Click on Image to Enlarge
|
The family room looking toward the living room. This floor will be
painted and covered with a large rug. (10.14.01) |
|

Click on Image to Enlarge
|
Living room floor gets its first coat of floor wax. (10.14.01) |
|

Click on Image to Enlarge
|
Last tub/shower surround panel is installed along with fixture knobs. (10.14.01) |
|

Click on Image to Enlarge
|
Living room as seen from front porch. (10.14.01) |
|

Click on Image to Enlarge
|
Living room looking toward front door and study. (10.14.01) |
|

Click on Image to Enlarge
|
The study looking toward the living room. (10.14.01) |
|
|
|
|
|