Rain Creek Farm -
Progress Updates
|
|
September 29, 2001

|
|

Click on Image to Enlarge |
Saturday morning included a trip to the lumber yard for PVC pipe, CPVC pipe and
a few 12-foot 2x6's. (09.29.01) |
|

Click on Image to Enlarge |
Four 12-foot 2x6's were added above the back wall of the storage shed.
This will provide an additional 12-foot wide, 4-foot deep shelf. After the
new 2x6's were in place, insulation and plywood were added below. A review
of our inventory found that we're going to be short seven rolls of 24-inch
fiberglass insulation to finish the storage shed project. (09.29.01) |
|

Click on Image to Enlarge |
We're nearly finished with the ground level walls. This section had a
dramatic effect on the afternoon temperature inside the shed. David added
wiring for a light switch next to the entry door. If we were not running
out of insulation we might have finished this weekend. (09.29.01) |
|

Click on Image to Enlarge |
Linda finished cleaning and priming the ceiling. What a big job!
Tomorrow, Sunday, the family room will get its first coat of real paint.
We're both anxious to see the new color on the walls. (09.29.01) |
|
|
|
|
|
Last Updated:
03.02.03
|