Rain Creek Farm - Progress Updates 

    September 29, 2001 

M9291219.jpg (71508 bytes)
Click on Image to Enlarge

Saturday morning included a trip to the lumber yard for PVC pipe, CPVC pipe and a few 12-foot 2x6's.  (09.29.01)

M9291245.jpg (41340 bytes)
Click on Image to Enlarge

Four 12-foot 2x6's were added above the back wall of the storage shed.  This will provide an additional 12-foot wide, 4-foot deep shelf.  After the new 2x6's were in place, insulation and plywood were added below.  A review of our inventory found that we're going to be short seven rolls of 24-inch fiberglass insulation to finish the storage shed project.  (09.29.01)

M9291246.jpg (41940 bytes)
Click on Image to Enlarge

We're nearly finished with the ground level walls.  This section had a dramatic effect on the afternoon temperature inside the shed.  David added wiring for a light switch next to the entry door.  If we were not running out of insulation we might have finished this weekend.  (09.29.01)

M9291253.jpg (27270 bytes)
Click on Image to Enlarge

Linda finished cleaning and priming the ceiling.  What a big job!  Tomorrow, Sunday, the family room will get its first coat of real paint.  We're both anxious to see the new color on the walls.  (09.29.01)