Rain Creek Farm - Progress Updates 

    September 22, 2001 

M9221028.jpg (22148 bytes)
Click on Image to Enlarge

Linda cleans family room ceiling with chemicals to remove years of mildew.  (09.22.01)

M9221027.jpg (22380 bytes)
Click on Image to Enlarge

The mildew is removed so that the ceiling can be primed.   (09.22.01)

M9221039.jpg (24792 bytes)
Click on Image to Enlarge

With the ceiling cleaned and the walls already primed the family room starts taking shape.  (09.22.01)

M9221030.jpg (34181 bytes)
Click on Image to Enlarge

Before.

Behind the house, one end of the garage shed has a work room (laundry) that's going to become a storeroom.  A 4x12 section of second floor will be added along this back side to provide additional storage space.  (09.22.01)

M9221034.jpg (43725 bytes)
Click on Image to Enlarge

In-Work.

Shelves and old wall boards are being removed to clean out rat nests.  Before the new walls go up the holes to the outside will be patched with metal flashing.  (09.22.01)

M9221038.jpg (39792 bytes)
Click on Image to Enlarge

End of Day.

Ready for additional studs and nailers required to accommodate sheets of 3/8-inch plywood that will be the new walls.  All of the walls will be insulated.  (09.22.01)

M9221032.jpg (37042 bytes)
Click on Image to Enlarge

Before.

While the walls will be wood the ceiling/roof will have insulation batts held into place with chicken wire.  (09.22.01)

M9221037.jpg (32760 bytes)
Click on Image to Enlarge

End of Day.

Someday this may once again be a workroom, but for the near future it will hold the dozens and dozens of boxes that have traveled from Texas to California and back.  Many of the boxes haven't been opened for three or four years!  (09.22.01)

Last Updated: 03.02.03