Rain Creek Farm -
Progress Updates
|
|
September 3, 2001

|
|

Click on Image to Enlarge |
A section of framing is assembled in the family room. This will be the
new bathroom doorway. (09.03.01) |
|

Click on Image to Enlarge |
And yes, it fit perfectly! Note that we added a transom window over the
door. This will provide some natural light for the hallway even when the
door is closed. The green door was at the hallway end of the closet.
In this picture it's just leaning against the wall, but it is where the bathroom
door will stand when installed and open. (09.03.01) |
|

Click on Image to Enlarge |
Next, a closet floor. David installs stringers between floor joists to
provide framework for a trap door. Later he would be underneath guiding
the precut floor sheeting into place while Linda taps it with a hammer from
above. (09.03.01) |
|

Click on Image to Enlarge |
The closet is ready for the floor. After the floor is finished a new wall
will be placed at this end of the closet where the floor materials change.
This wall will create a 12-inch deep nook at the end of the hall where shelving
will be placed. (09.03.01) |
|

Click on Image to Enlarge |
And here's the closet floor, complete with trap door in the upper right hand
corner. (09.03.01) |
|

Click on Image to Enlarge |
Meanwhile, Linda's hard at work still scrubbing and scrubbing and
scrubbing. Is there no end? Apparently not. (09.03.01) |
|
|
|
|
|
Last Updated:
03.02.03
|