| Night work continues as we push to get the bathroom done. Since the ceiling is taller than eight-feet standard wall sheeting will not reach the floor. Bottom plate boards are nailed into place along the floor to support the bottom of wall sheeting. (08.30.01) | |
| The first of several new wall boards is put into place over new insulation. The wall at the left still has old plaster board that needs to be removed. That wall will not be covered with plywood. It will be covered with beaded board strips, same as the plywood. (08.30.01) | |
|
|