    April 15, 2001 

M4151711.jpg (40600 bytes)
Click on Image to Enlarge

Today we removed the bedroom closet floor, as planned.  The plumbing on the right is for the bathroom sink.  (04.15.01)

M4151712.jpg (38101 bytes)
Click on Image to Enlarge

We also removed about 1/3rd of the bathroom floor, not planned.  (04.15.01)