Rain Creek Farm - Progress Updates 

  March 27 thru April 13, 2001      Hover Your Pointer Over Images for Descriptive Text.

Here's the kitchen stove hood that's coming out.  This will be the location of our refrigerator.  The chimney will be left exposed to the living room.  This side will be covered by the wall cabinet over the refrigerator.  (03.27.01)
Click on Image to Enlarge

One of three rose bushes around the front of our farmhouse.  (04.04.01)
Click on Image to Enlarge
I've started putting wire in the walls.  Drill, saw, fish, pull.  (04.04.01)
Click on Image to Enlarge
Here's the kitchen sink we found at Warrenton during the big antique shows.  We think it will be the center piece of the kitchen. (04.08.01) 
Click on Image to Enlarge

A couple more Warrenton Show finds, a chimney pot and sign. (04.10.01)
Click on Image to Enlarge

The Texas Department of Transportation installing our new mail box along FM955 across from our farmhouse.  (04.11.01)
Click on Image to Enlarge
And here it is!  A nice big mail box.  (04.11.01) 
Click on Image to Enlarge
Friday our trash box was delivered.  Within 30-minutes it was full!  (04.12.01) 
Click on Image to Enlarge

Linda on the back porch as we prepare for a trip to Houston to purchase materials for our weekend of remodeling.  (04.13.01) 
Click on Image to Enlarge

Last Updated: 04.14.01